How Long Does It Take To Fit A Bathroom
If you are willing to change your old bathroom to a new one but are confused about the time duration it will take, then this article is for you. Here we are going to let you know about the step by the step time duration of getting a new bathroom.
Generally, it will take you around two weeks to get a new bathroom though it may vary as the time depends on various factors. However, we can give you an idea about the process, and the time it will take.
Below we are going to mention the steps, and the particular time it will take to complete those.
Stripping out: 1 day
The first step is to strip out the old bathroom that you already have. This process usually takes one day or one and a half in case of a larger bathroom. However, you can undergo any pipe alteration process on the second day. Moving any wall or knocking them will take more time for obvious.
Plastering: 2 days
Plastering is the second step, and you will need two days for this step as you have to re-plaster the walls and the ceiling as well.
The plaster with a smooth finish will make it easy to tile the walls and also make the top fresh and soft looking. Some people don’t make an application in the whole bathroom, but it’s the best option to re-plaster all over the toilet for a smooth and new look.
However, drying the plaster may take more than two days, but you can continue other works in between.
Fixing of the bathroom suites: 3 to 4 days
In this step, you need to fix the bathroom suites, and you need to do this step before doing the tiling on the floor and the walls. The fixing may take three to four days, and seeing your new bathroom to grow will be, of course, a fantastic experience.
Tiling the bathroom: 2 days
Tiling entirely changes the appearance of your bathroom as it changes the room into a new one. The tiling of a usually shaped bathroom may take two days unless you have a huge bathroom. After finishing the tiling, you can step forward to the last step, which is final fixing.
Final fix: 1 to 2 days
The process of getting a new bathroom is about to finish with the final fix step. The final fix will ensure the smooth working of all the bathroom suites. This step may take one or two days as you have to fix every minor and significant thing in this step. However, usually, the final fix doesn’t take more than two days.
So, it will take around nine to twelve days to change your bathroom to a brand new one on average. In those days you have to cope with your new toilet or may move out temporarily, whichever is convenient for you.
Conclusion
Hopefully, you have got an elaborated calculation of the step by step duration that renovating a bathroom will take. However, the estimate may vary depending on the amount of work and the dimension of your bathroom.